Caltrans and SJJPA Awarded Federal MEGA Grant for Madera High-Speed Rail Station to Serve HSR Early Operating Segment

d34tiw64n5z4oh.cloudfront.net/wp-content/uploads/JPA17296_ServiceAlertTemplates_JPA-15-scaled.jpg

For Immediate Release
October 30, 2024

SJJPA Contact:
David Lipari, San Joaquin Joint Powers Authority
E-mail: david@sjjpa.com
Phone: (209) 851-1626

Caltrans Contact:
Tami L. Cox, Caltrans
Email: tami.cox@dot.ca.gov
Phone: (559) 488-4082

Caltrans and SJJPA Awarded Federal MEGA Grant for Madera High-Speed Rail Station to Serve HSR Early Operating Segment

(October 30 -- Stockton, CA) – The San Joaquin Joint Powers Authority (SJJPA) and the California Department of Transportation (Caltrans) have secured $54.5 million in federal grant funding through the Multimodal Project Discretionary Grant (MPDG) MEGA initiative to support the Madera High-Speed Rail (HSR) Station Project. The funding will be used for construction at the future relocated Madera Amtrak Station site along Avenue 12, transforming it into a state-of-the-art Madera High-Speed Rail Station, serving Madera County and Northern Fresno County as a vital part of the California High-Speed Rail (CHSR) Merced-Bakersfield Early Operating Segment (EOS).

 

The grant will fund design and construction of critical station infrastructure, including new platforms, trackwork, an overhead contact system, a bus depot, expanded auto parking, an access roadway network, a multi-use path, and station building – enhancing the passenger experience and improving transportation connectivity through the region.

 

The MEGA program grants are intended to support major, complex infrastructure projects that generate significant economic, mobility, and safety benefits on a national or regional scale. The Madera HSR Station will be built as an at-grade facility on an undeveloped site, streamlining the construction process and reducing potential challenges. This station’s construction is a critical component of the Merced-Bakersfield EOS of the CHSR system. The project is planned to be completed by 2030 to coincide with CHSR operating schedule for its EOS.

 

SJJPA, the California High-Speed Rail Authority, and the California State Transportation Agency (CalSTA) have partnered to implement the CHSR EOS in each direction from Merced to Bakersfield, with intermediate stations at Madera, Fresno, and Kings/Tulare. The system will be integrated seamlessly at the Merced HSR Station with Gold Runner (trains and Thruway buses) and ACE commuter rail services to provide enhanced connectivity across California.

 

“Partnering with state and local agencies, California is using its transportation dollars to provide travelers with more options that support the department’s commitment to reduce planet-warming pollution, improve air quality and create a more equitable and sustainable system that works for all users,” said Caltrans Director Tony Tavares.

 

“This award is crucial for the San Joaquin Valley and California,” said Stacey Mortensen, Executive Director of SJJPA. “We are grateful to the U.S. Department of Transportation for this critical funding. The Madera Station Project will play a pivotal role in connecting this region to key destinations across California through an integrated network of High-Speed Rail, Gold Runner, and ACE Rail services. The improvements to this station will drive economic opportunities while supporting the state’s efforts to reduce emissions and promote sustainable development.”

 

Caltrans, SJJPA, and the CHSRA are committed to the successful planning, design, construction, operation, and maintenance of California’s high-speed rail system. This shared vision includes a high-speed rail system that:

    • Promotes sustainable housing and development patterns that recognize the local, regional, state, and federal goals and interests;
      • Integrates station access and amenities into the fabric of the county;
        • Stimulates multimodal connectivity and thereby increases options for affordable, convenient access to goods, services, and employment;
          • Reduces per passenger transportation emissions across California, thereby reducing associated environmental and health impacts; and
            • Protects ecologically sensitive and agricultural lands.

           

          This project will help improve air quality, support state goals to reduce transportation-related pollution, and allow for the continued expansion of passenger rail in California.

SJJPA Restores 7th Daily Gold Runner Round Trip, Improving Inter-City Rail Travel Between Bakersfield and Sacramento

(December 1 -- Stockton, CA) – The San Joaquin Joint Powers Authority (SJJPA) announced at its November 21 Board Meeting that the 7th daily round trip will return on December 8, marking the first time since early 2020 that the corridor will run its full pre-pandemic schedule. The restored trip expands travel options for riders moving between Bakersfield, the San Joaquin Valley, and Sacramento.

View More
Gold Runner Service Alert – Temporary Change to Route 1C

 Affected Bus Schedules: 5811 & 5818 Dates: Begin Saturday November 22 through and including Sunday December 14. San Diego Santa Fe Depot (SAN) is undergoing construction that hampers safe access to/from the bus bays. We have gained approval from Metropolitan Transit System (MTS) to temporarily relocate bus schedules 5811 & 5818 to Old Town […]

View More
Amtrak San Joaquins Becomes Gold Runner, Marking a New Era for California Passenger Rail

November 3, Stockton, CA – The San Joaquin Joint Powers Authority (SJJPA) is proud to introduce a new chapter in the history of California’s intercity passenger rail services with the rebrand from Amtrak San Joaquins to Gold Runner, effective November 3, 2025.

View More
Secured By miniOrange